Two difficult streams come out of every incineration plant
Waste-to-energy water projects deal with leachate on one side and fly ash on the other. Both are classified as difficult, both can be recovered, and a plant that runs continuously cannot afford either to fail.
Waste-to-energy water projects
Which waste-to-energy clients JINGYU has worked with, what an incineration plant needs from its water system, and why availability matters more here than on a batch process.
Written in the company's own voice: what was done, when, and what was learned. Not a technology description, which belongs on the solution pages.
What waste-to-energy plants need
To be supplied — one sentence, the single most important lesson from this sector.
To be supplied — around 80 to 120 words setting up the three points below. Why a water system that loses capacity is a bigger problem at an incineration plant than almost anywhere else.
To be supplied — the conclusion, around 50 words. What a client should take away from this record.
Inside the plants
Photographs from delivered projects. Replace each placeholder with an uploaded image and its caption.
Projects in this category
Waste-to-energy projects are being added to this page.
No project in this category has been recorded yet. Send the project name, location, capacity, timeline and outcome and it will be added here in the same format as the other categories.
Fly ash recovery is covered on our fly ash projects page, and leachate on the landfill leachate page. The full record across every sector is on the projects page.
Frequently asked questions
What does a waste-to-energy plant need from its water system?
Availability above all. The incinerator runs continuously, so a leachate system that loses capacity becomes a constraint on the whole site, not just on the water plant.
What recovery is achievable on incineration leachate?
Around 90% of the flow returned as reusable water, with the remaining 10% crystallized into salt. The route is described on our leachate solution page.
Do you treat the fly ash as well?
Yes. Seven fly ash recovery sites are under construction in Shanghai, recovering sodium chloride and potassium chloride from incineration residue.
How many municipal projects has JINGYU delivered?
More than 100, of which over 50 run the full chain from biological treatment through anaerobic and aerobic stages, MBR, nanofiltration and advanced polishing.
Can I visit one of these plants?
In some cases, subject to the client's agreement. Tell us which project interests you and we will ask.
Are full case studies available?
Yes, subject to each client's confidentiality terms.
Ask about one of these projects
Start here
Tell us which project looks closest to your situation, or send your own analysis. We will come back with the reference that actually matches.
Useful to include
- Incineration capacity and number of lines
- Leachate flow and its seasonal variation
- COD, ammonia and total nitrogen
- Fly ash quantity, if that is in scope
- Current treatment and where the concentrate goes