Mine Water ZLD Projects: Five Plants Up to 3,000 m3/h
PROJECTS · MINING & MINE WATER

Five mine water plants, two of them ours to run

These mine water ZLD projects cover mine drainage, mine dewatering and the domestic sewage that comes with a mine site. Every plant below carries a capacity, the salt it recovers and the year it started.

5Mine water plants delivered
3,000 m³/hLargest design capacity
2020First mine water ZLD in China
BOOOne plant owned and operated
01Our record

Mine water ZLD projects

To be supplied — opening section, around 150 to 200 words

When JINGYU took on its first mine water project, what the scale of these flows demanded, and how the approach changed across the five plants that followed.

Written in the company's own voice: what was done, when, and what was learned. Not a technology description, which belongs on the solution pages.

02Experience

What five mine water plants taught us

To be supplied — one sentence, the single most important lesson from this sector.

To be supplied — around 80 to 120 words setting up the three points below. What goes wrong when mine water is treated as a simple, low-strength stream.

Lesson oneTo be supplied — roughly 20 words.
Lesson twoTo be supplied — roughly 20 words.
Lesson threeTo be supplied — roughly 20 words.

To be supplied — the conclusion, around 50 words. What a client should take away from this record.

03On site

Inside the plants

Photographs from delivered projects. Replace each placeholder with an uploaded image and its caption.

Photo 1
Suggested: aerial view of a mine water plant. File name: mine-water-zld-plant-aerial.jpg
Photo 2
Suggested: softening and clarification stage. File name: mine-water-softening-clarification.jpg
Photo 3
Suggested: membrane concentration hall. File name: mine-water-membrane-concentration.jpg
Photo 4
Suggested: evaporation and crystallization building. File name: mine-water-evaporation-crystallization.jpg
Photo 5
Suggested: recovered salt in the packing area. File name: mine-water-recovered-salt.jpg
Photo 6
Suggested: underground or wellhead pretreatment. File name: mine-water-underground-pretreatment.jpg

The five mine water ZLD projects

Each with a location, a capacity and the year it started running.

BOO / BOTOperating

Hongqinghe Mine Water (Yitai Guanglian)

Ordos, Inner Mongolia

Scale
14,400 m³/d
Recovered
Reuse water and recovered salt
Timeline
Operating since 2020

China's first mine water zero liquid discharge project, on the edge of the Mu Us desert. Owned and operated by JINGYU.

EPCOperating

Baijiahaizi Mine Water and Sewage

Wushen Banner, Ordos

Scale
3,000 m³/h · evaporation feed 100 m³/h · feed TDS 5,100, hardness 1,333, COD 20, SiO₂ 10
Recovered
Sodium sulfate · mixed salt below 10%
Timeline
Built 2022 · Operating since 2023

The largest mine water project by design capacity that JINGYU has delivered.

EPC + OOperating

Tangjiahui Mine Water

Tangjiahui Mine, Ordos

Scale
Underground pretreatment 600 m³/h · advanced treatment 560 m³/h
Recovered
NaCl and Na₂SO₄ crystallized on site
Timeline
Built 2023 · Operating since 2025

Design, procurement, construction and operation under one contract.

EPC + OOperating

Sunjiacha Longhua Mine Drainage

Shenmu, Shaanxi

Scale
60 m³/h · evaporation feed 30 m³/h
Recovered
Sodium chloride and sodium sulfate, co-produced
Timeline
Built 2023 · Operating since 2024

Silica removal, sand filtration and ultrafiltration, high-pressure RO, then combined salt and nitrate crystallization.

O&M onlyOperating

Huaneng Hetaoyu Coal Mine Water Stations

Zhengning, Gansu

Scale
Three stations: mine drainage, industrial and domestic wastewater
Recovered
Compliant discharge and reuse
Timeline
From 2024 · Contract to 2027

Full outsourced operation: equipment, chemicals, water quality, sludge and hazardous waste, staffing and environmental compliance.

Why mine water is limited by hardness rather than salinity is covered on our mine water solution page. The full record across every sector is on the projects page.

04Questions

Frequently asked questions

How large can a mine water plant get?

Baijiahaizi is designed for 3,000 m3/h of mine water, treated alongside 1,700 t/d of domestic sewage. It is the largest by design capacity in our record.

Does JINGYU own any of these plants?

Yes. Hongqinghe is a build-own-operate asset, and the first mine water ZLD plant in China. Hetaoyu is a three-station outsourced operation contract.

What is recovered from mine water?

Mostly sodium chloride and sodium sulfate. The ratio depends on the ion balance of the specific mine, so the separation route is chosen per project.

Is domestic sewage treated in the same plant?

Often yes, on its own train. At Baijiahaizi it runs through pretreatment, biological treatment, MBR, nitrogen removal and disinfection.

Can I visit one of these plants?

In some cases, subject to the client's agreement. Tell us which project interests you and we will ask.

Are full case studies available?

Yes, covering feed water, process configuration, guarantees and operating results, subject to each client's confidentiality terms.

Ask about one of these projects

Start here

Tell us which project looks closest to your situation, or send your own analysis. We will come back with the reference that actually matches.

Useful to include

  • Mine water flow, and how it varies with the season
  • Calcium, magnesium, silica and alkalinity
  • TDS, chloride and sulfate
  • Current recovery and where the concentrate goes
  • Whether domestic sewage is treated on the same site