Industrial Park Water Reuse: Half a Park Supplied by Reuse
PROJECTS · INDUSTRIAL PARKS

One water system, many tenants, one balance to close

Industrial park water reuse is a different problem from a single plant. Several producers discharge into one system, and the park operator has to make a balance close across all of them.

25,000 m³/dCapacity after expansion
~50%Of the park’s industrial water demand
500,000 tWater saved per year
RMB 163MTotal project investment
01Our record

Industrial park water reuse projects

To be supplied — opening section, around 150 to 200 words

Why an industrial park water system is harder to design than a single producer’s plant, and how JINGYU approached a scheme serving multiple tenants from one reuse plant.

Written in the company's own voice: what was done, when, and what was learned. Not a technology description, which belongs on the solution pages.

02Experience

What a park water system teaches you

To be supplied — one sentence, the single most important lesson from this sector.

To be supplied — around 80 to 120 words setting up the three points below. What happens when several tenants with different effluents share one treatment plant, and why source segregation decides the cost of the whole scheme.

Lesson oneTo be supplied — roughly 20 words.
Lesson twoTo be supplied — roughly 20 words.
Lesson threeTo be supplied — roughly 20 words.

To be supplied — the conclusion, around 50 words. What a client should take away from this record.

03On site

Inside the plants

Photographs from delivered projects. Replace each placeholder with an uploaded image and its caption.

Photo 1
Suggested: reclaimed water plant overview. File name: industrial-park-reuse-plant-overview.jpg
Photo 2
Suggested: ultrafiltration and RO hall. File name: industrial-park-ultrafiltration-ro.jpg
Photo 3
Suggested: MVR evaporation and crystallization. File name: industrial-park-mvr-crystallization.jpg
Photo 4
Suggested: reclaimed water storage and distribution. File name: industrial-park-reclaimed-water-storage.jpg
Photo 5
Suggested: recovered salt from the park brine. File name: industrial-park-recovered-salt.jpg
Photo 6
Suggested: aerial view of the park served. File name: industrial-park-aerial-view.jpg

The project

Location, capacity and what it delivers to the park.

EP / equipmentUnder construction

Yinchuan Suyin Industrial Park, water reuse

Yinchuan, Ningxia

Scale
1,050 m³/h, expanding to 25,000 m³/d · feed TDS 1,800, Ca 120, Mg 70, COD 50, SiO₂ 30
Recovered
Na₂SO₄ 5 m³/h · NaCl 6.5 m³/h
Timeline
Started 2023 · Startup 2025

Ultrafiltration, two-pass reverse osmosis and MVR crystallization. Covers around half the park's industrial water demand and saves over 500,000 tonnes of water a year.

Why segregating streams at source keeps a park brine system affordable is explained on our fractional crystallization page. The full record across every sector is on the projects page.

04Questions

Frequently asked questions

What makes an industrial park water system different?

Several tenants discharge into one plant, each with its own effluent. Mixing them means treating clean water as if it were dirty, so the design begins with which streams to keep apart.

How much water does the Yinchuan scheme save?

Over 500,000 tonnes a year, and it supplies around half of the park's industrial water demand from reclaimed water.

What process does it use?

Ultrafiltration, two-pass reverse osmosis and MVR evaporation and crystallization, with salt separation on the concentrated brine.

What was JINGYU's scope?

Process equipment procurement, installation, commissioning and the associated electrical and control work, rather than full construction.

When does it start up?

Construction began in October 2023 and startup is scheduled for December 2025. The status shown on the project card is kept current.

Are full case studies available?

Yes, covering feed water, process configuration, guarantees and operating results, subject to the client's confidentiality terms.

Ask about one of these projects

Start here

Tell us which project looks closest to your situation, or send your own analysis. We will come back with the reference that actually matches.

Useful to include

  • Number of tenants and the streams they discharge
  • Total flow and TDS of the combined effluent
  • Which streams are currently combined, and which could be kept apart
  • Reuse demand within the park
  • Whether a crystallizer already exists on site