One water system, many tenants, one balance to close
Industrial park water reuse is a different problem from a single plant. Several producers discharge into one system, and the park operator has to make a balance close across all of them.
Industrial park water reuse projects
Why an industrial park water system is harder to design than a single producer’s plant, and how JINGYU approached a scheme serving multiple tenants from one reuse plant.
Written in the company's own voice: what was done, when, and what was learned. Not a technology description, which belongs on the solution pages.
What a park water system teaches you
To be supplied — one sentence, the single most important lesson from this sector.
To be supplied — around 80 to 120 words setting up the three points below. What happens when several tenants with different effluents share one treatment plant, and why source segregation decides the cost of the whole scheme.
To be supplied — the conclusion, around 50 words. What a client should take away from this record.
Inside the plants
Photographs from delivered projects. Replace each placeholder with an uploaded image and its caption.
The project
Location, capacity and what it delivers to the park.
Yinchuan Suyin Industrial Park, water reuse
Yinchuan, Ningxia
- Scale
- 1,050 m³/h, expanding to 25,000 m³/d · feed TDS 1,800, Ca 120, Mg 70, COD 50, SiO₂ 30
- Recovered
- Na₂SO₄ 5 m³/h · NaCl 6.5 m³/h
- Timeline
- Started 2023 · Startup 2025
Ultrafiltration, two-pass reverse osmosis and MVR crystallization. Covers around half the park's industrial water demand and saves over 500,000 tonnes of water a year.
Why segregating streams at source keeps a park brine system affordable is explained on our fractional crystallization page. The full record across every sector is on the projects page.
Frequently asked questions
What makes an industrial park water system different?
Several tenants discharge into one plant, each with its own effluent. Mixing them means treating clean water as if it were dirty, so the design begins with which streams to keep apart.
How much water does the Yinchuan scheme save?
Over 500,000 tonnes a year, and it supplies around half of the park's industrial water demand from reclaimed water.
What process does it use?
Ultrafiltration, two-pass reverse osmosis and MVR evaporation and crystallization, with salt separation on the concentrated brine.
What was JINGYU's scope?
Process equipment procurement, installation, commissioning and the associated electrical and control work, rather than full construction.
When does it start up?
Construction began in October 2023 and startup is scheduled for December 2025. The status shown on the project card is kept current.
Are full case studies available?
Yes, covering feed water, process configuration, guarantees and operating results, subject to the client's confidentiality terms.
Ask about one of these projects
Start here
Tell us which project looks closest to your situation, or send your own analysis. We will come back with the reference that actually matches.
Useful to include
- Number of tenants and the streams they discharge
- Total flow and TDS of the combined effluent
- Which streams are currently combined, and which could be kept apart
- Reuse demand within the park
- Whether a crystallizer already exists on site