Five mine water plants, two of them ours to run
These mine water ZLD projects cover mine drainage, mine dewatering and the domestic sewage that comes with a mine site. Every plant below carries a capacity, the salt it recovers and the year it started.
Mine water ZLD projects
When JINGYU took on its first mine water project, what the scale of these flows demanded, and how the approach changed across the five plants that followed.
Written in the company's own voice: what was done, when, and what was learned. Not a technology description, which belongs on the solution pages.
What five mine water plants taught us
To be supplied — one sentence, the single most important lesson from this sector.
To be supplied — around 80 to 120 words setting up the three points below. What goes wrong when mine water is treated as a simple, low-strength stream.
To be supplied — the conclusion, around 50 words. What a client should take away from this record.
Inside the plants
Photographs from delivered projects. Replace each placeholder with an uploaded image and its caption.
The five mine water ZLD projects
Each with a location, a capacity and the year it started running.
Hongqinghe Mine Water (Yitai Guanglian)
Ordos, Inner Mongolia
- Scale
- 14,400 m³/d
- Recovered
- Reuse water and recovered salt
- Timeline
- Operating since 2020
China's first mine water zero liquid discharge project, on the edge of the Mu Us desert. Owned and operated by JINGYU.
Baijiahaizi Mine Water and Sewage
Wushen Banner, Ordos
- Scale
- 3,000 m³/h · evaporation feed 100 m³/h · feed TDS 5,100, hardness 1,333, COD 20, SiO₂ 10
- Recovered
- Sodium sulfate · mixed salt below 10%
- Timeline
- Built 2022 · Operating since 2023
The largest mine water project by design capacity that JINGYU has delivered.
Tangjiahui Mine Water
Tangjiahui Mine, Ordos
- Scale
- Underground pretreatment 600 m³/h · advanced treatment 560 m³/h
- Recovered
- NaCl and Na₂SO₄ crystallized on site
- Timeline
- Built 2023 · Operating since 2025
Design, procurement, construction and operation under one contract.
Sunjiacha Longhua Mine Drainage
Shenmu, Shaanxi
- Scale
- 60 m³/h · evaporation feed 30 m³/h
- Recovered
- Sodium chloride and sodium sulfate, co-produced
- Timeline
- Built 2023 · Operating since 2024
Silica removal, sand filtration and ultrafiltration, high-pressure RO, then combined salt and nitrate crystallization.
Huaneng Hetaoyu Coal Mine Water Stations
Zhengning, Gansu
- Scale
- Three stations: mine drainage, industrial and domestic wastewater
- Recovered
- Compliant discharge and reuse
- Timeline
- From 2024 · Contract to 2027
Full outsourced operation: equipment, chemicals, water quality, sludge and hazardous waste, staffing and environmental compliance.
Why mine water is limited by hardness rather than salinity is covered on our mine water solution page. The full record across every sector is on the projects page.
Frequently asked questions
How large can a mine water plant get?
Baijiahaizi is designed for 3,000 m3/h of mine water, treated alongside 1,700 t/d of domestic sewage. It is the largest by design capacity in our record.
Does JINGYU own any of these plants?
Yes. Hongqinghe is a build-own-operate asset, and the first mine water ZLD plant in China. Hetaoyu is a three-station outsourced operation contract.
What is recovered from mine water?
Mostly sodium chloride and sodium sulfate. The ratio depends on the ion balance of the specific mine, so the separation route is chosen per project.
Is domestic sewage treated in the same plant?
Often yes, on its own train. At Baijiahaizi it runs through pretreatment, biological treatment, MBR, nitrogen removal and disinfection.
Can I visit one of these plants?
In some cases, subject to the client's agreement. Tell us which project interests you and we will ask.
Are full case studies available?
Yes, covering feed water, process configuration, guarantees and operating results, subject to each client's confidentiality terms.
Ask about one of these projects
Start here
Tell us which project looks closest to your situation, or send your own analysis. We will come back with the reference that actually matches.
Useful to include
- Mine water flow, and how it varies with the season
- Calcium, magnesium, silica and alkalinity
- TDS, chloride and sulfate
- Current recovery and where the concentrate goes
- Whether domestic sewage is treated on the same site