Zero Liquid Discharge Projects: Named, Dated, and Running
PROJECTS

Plants you can name, dated, with the salt they produce

These zero liquid discharge projects each carry a location, a capacity, the by-product recovered and the start year. Where one is still being built, it says so.

140+Water treatment projects delivered
45Integrated ZLD systems
18Plants we operate ourselves
1.89M tAnnual by-product capacity
01How to read this

What these zero liquid discharge projects show

A reference list is only worth something if it can be checked. Each card gives the plant, the place, the flow, the salt produced and the year it started.

Filter by industry to find the water closest to yours, or by delivery model to see how we were contracted.

This is a selection rather than the full record. JINGYU has delivered more than 140 water treatment projects, 45 of them integrated zero liquid discharge systems.

Zero liquid discharge projects, by industry and contract

Filter by industry

Filter by delivery model

Showing all 24 projects

Coal chemical EPC + O Operating

Yitai Fine Chemicals, 1.2 Mt/a

Ordos, Inner Mongolia

Scale
Wastewater I 28,800 m³/d · Wastewater II 43,200 m³/d · brine ZLD 13,440 m³/d @ TDS 10 g/L
Recovered
Reuse water 43,200 m³/d @ TDS 0.5 g/L · NaCl 20 kt/a · Na₂SO₄ 33 kt/a · salt recovery ≥98%
Timeline
Built 2015–2017 · Operating since 2018

Over eight years of continuous, stable operation. China's first ultra-large coal-to-liquids complex certified by the NDRC.

Coal chemical EPC + O Operating

Yitai CTL, 160 kt/a

Ordos, Inner Mongolia

Scale
Brine ZLD 1,440 m³/d · evaporation and crystallization 384 m³/d
Recovered
Sodium chloride and sodium sulfate, crystallized separately
Timeline
Built 2019 · Operating since 2021

China's first indirect coal liquefaction demonstration project. Also the first industrial use of our thermal salt separation route.

Coal chemical EPC + O Under construction

Yitai Ili Energy CTL, 1 Mt/a

Ili, Xinjiang

Scale
Wastewater plant 26,400 m³/d · reuse plant 40,800 m³/d · ZLD unit 1,920 m³/d
Recovered
Reuse water 40,800 m³/d @ TDS 0.2 g/L · NaCl 49 kt/a · Na₂SO₄ 7 kt/a
Timeline
Started 2025

The largest contract JINGYU has signed to date.

Coal chemical EPC Operating

Huineng Coal-to-Gas, 1.6 bcm/a

Ordos, Inner Mongolia

Scale
High-salinity concentration and salt separation ZLD, phase I revamp and phase II
Recovered
Separated salts from high-salinity brine
Timeline
Built 2018 & 2020 · Operating since 2020 and 2023

China's first coal-water-slurry gasification to natural gas complex. Its phase II gasifier is the largest single unit of its kind anywhere.

Coal chemical EPC Operating

Ningxia Baofeng, olefins and methanol

Lingwu, Ningxia

Scale
Brine ZLD 3,600 m³/d · evaporation and crystallization 1,248 m³/d
Recovered
Crystallized industrial salt from the brine ZLD system
Timeline
Built 2019 · Operating since 2022

Baofeng is the world's largest coal-to-olefins producer. JINGYU won its Outstanding Supplier Award for this project.

Coal chemical EPC Operating

Yidong Donghua Methanol, 600 kt/a

Ordos, Inner Mongolia

Scale
50 m³/h · evaporation 15 t/h · feed TDS 20,000, hardness 2,000, COD 200, SiO₂ 100
Recovered
NaCl and Na₂SO₄ as finished products
Timeline
Built 2019 · Operating since 2022

Full recovery of a high-salinity stream, to meet national discharge requirements.

Coal chemical EPC + O Operating

Shanxi Minguang Coking, 1.56 Mt/a

Linfen, Shanxi

Scale
Reclaimed water 200 m³/h · NF salt separation 50 m³/h · crystallization 16 m³/h
Recovered
NaCl 8 m³/h · Na₂SO₄ 8 m³/h
Timeline
Built 2023 · Operating since 2024

A coking upgrade programme with ZLD built into the water system from the start.

Coal chemical EPC + O Operating

Shanxi Coking, brine salt recovery

Linfen, Shanxi

Scale
Brine ZLD 4,800 m³/d
Recovered
Industrial salt recovered from coking wastewater
Timeline
Built 2021 · Operating since 2022

China's first coking wastewater ZLD project. Promoted as a model case by the Shanxi Ecology and Environment Department and the China Coking Industry Association.

Coal chemical BOO / BOT Under construction

Lanhua Coal Chemical, energy and environmental upgrade

Jincheng, Shanxi

Scale
Wastewater 4,200 m³/d · reclaimed water 15,000 m³/d · ZLD 4,800 m³/d
Recovered
Reuse water 15,000 m³/d @ TDS 0.5 g/L · NaCl 2.3 kt/a · Na₂SO₄ 15.2 kt/a
Timeline
Started 2025

A twenty-year build-own-operate contract covering the whole plant water system.

Mining & mine water BOO / BOT Operating

Hongqinghe Mine Water (Yitai Guanglian)

Ordos, Inner Mongolia

Scale
14,400 m³/d
Recovered
Reuse water and recovered salt
Timeline
Operating since 2020

China's first mine water zero liquid discharge project, on the edge of the Mu Us desert. Owned and operated by JINGYU.

Mining & mine water EPC Operating

Baijiahaizi Mine Water and Sewage

Wushen Banner, Ordos

Scale
3,000 m³/h · evaporation feed 100 m³/h · feed TDS 5,100, hardness 1,333, COD 20, SiO₂ 10
Recovered
Sodium sulfate · mixed salt below 10%
Timeline
Built 2022 · Operating since 2023

The largest mine water project by design capacity we have delivered.

Mining & mine water EPC + O Operating

Tangjiahui Mine Water

Tangjiahui Mine, Ordos

Scale
Underground pretreatment 600 m³/h · advanced treatment 560 m³/h
Recovered
NaCl and Na₂SO₄ crystallized on site
Timeline
Built 2023 · Operating since 2025

Design, procurement, construction and operation under one contract.

Mining & mine water EPC + O Operating

Sunjiacha Longhua Mine Drainage

Shenmu, Shaanxi

Scale
60 m³/h · evaporation feed 30 m³/h
Recovered
Sodium chloride and sodium sulfate, co-produced
Timeline
Built 2023 · Operating since 2024

Silica removal, sand filtration and ultrafiltration, high-pressure RO, then combined salt and nitrate crystallization.

Mining & mine water O&M only Operating

Huaneng Hetaoyu Coal Mine Water Stations

Zhengning, Gansu

Scale
Three stations: mine drainage, industrial and domestic wastewater
Recovered
Compliant discharge and reuse
Timeline
From 2024 · Contract to 2027

Full outsourced operation. Equipment, chemicals, water quality, sludge and hazardous waste, staffing and compliance.

Metals & metallurgy EPC + O Operating

Jinchuan Group, Nickel and Cobalt Smelting

Jinchang, Gansu

Scale
4,000 m³/d @ TDS 180 g/L
Recovered
NaCl 130 kt/a @ ≥98.5% · Na₂SO₄ 150 kt/a @ ≥99% · salt recovery 99%
Timeline
Built 2025 · Operating since 2025

Zero liquid discharge for the world's second largest nickel producer. The highest by-product salt output of any JINGYU project.

Metals & metallurgy EP / equipment Operating

Zhongtian Green Steel, Central Water Plant

Nantong, Jiangsu

Scale
Brine salt separation 145 m³/h · evaporation and crystallization 18 m³/h
Recovered
NaCl 18 m³/h crystallized
Timeline
Built 2020 · Operating since 2022

Complete supply of the salt separation and crystallization systems, with process and detailed engineering.

Petrochemical & refining EP / equipment Operating

Dongming Petrochemical Jieyuan, Phase II

Heze, Shandong

Scale
4,520 m³/d @ TDS 28 g/L
Recovered
NaCl 14.7 kt/a @ ≥98.5% · Na₂SO₄ 28.2 kt/a @ ≥97%
Timeline
Built 2021 · Operating since 2023

China's first salt separation ZLD project in the petrochemical industry. Process package plus core equipment supply.

Petrochemical & refining EPC In commissioning

PetroChina Dushanzi Tarim Ethylene, 1.2 Mt/a

Bayingolin, Xinjiang

Scale
2,020 m³/d @ TDS 84 g/L
Recovered
Recovered water and crystallized salt
Timeline
Started 2024 · In commissioning

Phase II zero liquid discharge for one of China's largest ethylene complexes.

Chemicals & new materials EP / equipment Operating

Linggu Chemical, ammonia and urea

Yixing, Jiangsu

Scale
Brine ZLD 11,280 m³/d · evaporation and crystallization 204 m³/d
Recovered
Reuse water 11,280 m³/d @ TDS 0.5 g/L · NaCl 8.8 kt/a @ ≥97.5% · Na₂SO₄ 1.3 kt/a @ ≥99%
Timeline
Built 2020 · Operating since 2022

The first full-scale ZLD plant to run successfully in China's fertilizer industry, verified by an industry authority.

Chemicals & new materials EP / equipment Operating

Luoyang Jianlong Micronano, molecular sieve park

Luoyang, Henan

Scale
12,000 m³/d
Recovered
NaCl 4,300 t/a · KCl 1,700 t/a · K₂SO₄ 11,000 t/a · Na₂SO₄ 20,000 t/a
Timeline
Built 2021 · Operating since 2022

China's first ZLD project in molecular sieve materials. The widest range of by-product salts we have produced.

Chemicals & new materials EPC + O Operating

Anhui Huaibei Chemical Base

Huaibei, Anhui

Scale
ZLD within an integrated chemical park water system
Recovered
NaCl 25 kt/a · Na₂SO₄ 26 kt/a
Timeline
Operating

Named a 2023 Typical Case for industrial park water management by China's Ministry of Ecology and Environment.

Photovoltaics & new energy EPC + O Operating

Mengsu Economic Development Zone (serving LONGi)

Ordos, Inner Mongolia

Scale
18,408 m³/d
Recovered
NaCl 42 kt/a @ ≥98.5% · salt recovery 95%
Timeline
Operating

The largest photovoltaic wastewater zero liquid discharge plant in the world.

Industrial parks EP / equipment Under construction

Yinchuan Suyin Industrial Park, water reuse

Yinchuan, Ningxia

Scale
1,050 m³/h, expanding to 25,000 m³/d · feed TDS 1,800, Ca 120, Mg 70, COD 50, SiO₂ 30
Recovered
Na₂SO₄ 5 m³/h · NaCl 6.5 m³/h
Timeline
Started 2023 · Startup 2025

Ultrafiltration, two-pass reverse osmosis and MVR crystallization. It covers about half the park's industrial water demand, saving over 500,000 tonnes a year.

Waste-to-energy & fly ash EPC Under construction

Shanghai Waste-to-Energy Fly Ash Recovery

Shanghai

Scale
800 t/d, 400 t/d, 300 t/d ×3, 150 t/d ×2, across seven sites
Recovered
NaCl 200 t/d @ ≥98.5% · KCl 60 t/d @ ≥93% · condensate below 1,000 mg/L
Timeline
Started 2026

Aimed at near-zero landfilling of Shanghai's incineration fly ash. A strategic move to free land for the city's future.

02Questions

Frequently asked questions

How many zero liquid discharge projects has JINGYU delivered?

More than 140 water treatment projects in total, including 45 integrated zero liquid discharge systems. Eighteen of those are operated by JINGYU under long-term contracts. The projects listed here are a representative selection, not the full record.

Are these plants actually running?

Each card carries a status. Operating means the plant is in commercial service, with the start year given. In commissioning and Under construction mean exactly that. We would rather show a project honestly than round it up.

Can I see the full data for a project?

Yes. Tell us which project interests you and we will provide a full case study. That covers feed water analysis, process configuration, guarantees and operating results, subject to the client's confidentiality terms.

What contract models are represented here?

EPC, EPC plus operation, EPCM plus operation, process package and equipment supply, BOO and BOT, and standalone O&M. Filter by delivery model to see which project used which.

Which project is closest to my water?

Filter by industry first, then read the feed characteristics on each card. If nothing matches closely, that is normal. Send your analysis and we will name the nearest technical reference.

Are any of these outside China?

The projects listed here are in China, where the hardest industrial water in the world is currently treated at scale. Our International Business Division was established in 2025 to bring the same capability to clients abroad.

Ask about the project closest to your water

Start here

Tell us which plant here looks closest to your situation, or send your own analysis. We will come back with the reference that actually matches.

Useful to include

  • Your industry and process
  • Flow rate and TDS
  • Ion balance, COD and hardness
  • Discharge limit or reuse target